Login

 Register

Introducing our new CIBSE Approved CPD!

05-12-2018


1Rising temperatures have highlighted issues with buildings overheating, and the contribution of building services to unwanted heat gains is coming under scrutiny.

Recent research from AECOM has suggested that the use of an enhanced specification of pipe insulation and insulated pipe supports on hot water and heating pipework can drastically reduce overheating in some buildings.

This 45 minute long seminar explains how the research was  conducted and examines the issues of overheating, including in void and corridor spaces, relating to building services insulation. It also looks at the benefits of going a step further than the base Building Regulation requirements, along with optimising the design and implementation of building services insulation systems.

Click here to book the CPD