Login

 Register

Amokabel Launches the First Cca-Rated BS 8436 Cable

02-09-2025


flexishield-CPR-Cca

June 2025 – In a move aligning with the UK’s tightening fire safety regulations, Amokabel has announced the release of a new Construction Products Regulation (CPR) fire performance Cca-rated version of its BS 8436 Flexishield cable, Flexishield-Cca®, marking a significant step forward in fire-resistant electrical infrastructure. This development comes at a pivotal time, as the UK government accelerates implementation of the 58 recommendations from the Grenfell Tower Inquiry Phase 2 report1.

 A Regulatory Landscape in Transition

The Grenfell tragedy in 2017, which claimed 72 lives, exposed critical failures in building safety, particularly around combustible materials and inadequate evacuation strategies. In response, the UK government has committed to a comprehensive overhaul of fire safety legislation, including:

  •  The creation of a single construction regulator to oversee compliance2.
  • Mandatory accreditation for fire risk assessors and fire engineers2.

  • A transition from BS 476 to European fire testing standards (which includes BS EN 13501-6, classifying cables based on their response to fire testing)3.

  • A review of Approved Document B and the clear definition of “higher-risk buildings”4.

 These reforms are to be rolled out with a strong emphasis on product accountability, resident safety and industry transparency.

 What Cca-Rated Means and Why It Matters

Under the BS EN 13501-6 classification system, a Cca rating indicates that a cable has a limited contribution to fire, with low smoke production and minimal flaming droplets. This is a significant upgrade from lower-rated cables (e.g., Dca, Eca or Fca), which are more prone to spreading fire and producing toxic smoke.

 Amokabel’s new Flexishield-Cca® variant meets this higher standard, making it the first shielded fail-safe BS 8436 compliant cable suitable for use in higher risk applications such as escape routes, high-rise residential buildings, public buildings, hospitals, and schools - settings where higher fire performance is critical.

 Future Applications and Industry Trends

The introduction of Flexishield-Cca® positions Amokabel Flexishield to meet growing demand in several emerging areas related to increased fire safety:

  •  Retrofitting of existing high-risk buildings, especially those undergoing remediation under the government’s Remediation Acceleration Plan4.

  • New builds subject to Gateway 2 approvals, where fire strategy documentation and material compliance are under stricter scrutiny.

  • Infrastructure projects requiring compliance with updated CE marking and European fire safety standards3.

 As the UK transitions to a more robust regulatory framework, manufacturers like Amokabel are expected to play a key role in delivering safer, compliant products that support the construction industry in achieving the government’s long-term vision for building safety.

 Conclusion

Amokabel’s Flexishield-Cca® is more than a product release—it’s a signal of the industry’s shift toward higher safety standards, greater accountability, and future-proofed infrastructure. As the UK continues to implement the lessons from Grenfell, such advancements will be essential in rebuilding public trust and ensuring that safety is never compromised.

 Citations

1Progress report: summary update - GOV.UK

2Grenfell Inquiry response: Government announces reforms, industry calls ... internationalfireandsafetyjournal.com

3UK Fire Safety Legislation 2025-2029 Key Changes | IPSFS ipsfs.co.uk

4Building Safety Update February 2025: Government response to Grenfell simmons-simmons.com

Click here to download the datasheet.